Newsletter


Newsletter

This page is under construction. Thank you for your comprehension.

Voltage sag evaluation during large motors startup

 

Introduction

 

Multi-time-step and multi-core simulations in EMTP-RV using the new FMI options

Introduction

EMTP"

 

Take advantage of the open architecture of EMTP-RV to create customized tools and libraries

 

You can take advantage of the open architecture of EMTP-RV to create customized toolboxes. A toolbox can contain libraries, documentations, scripts, DLLs and examples. Its content is loaded automatically when EMTP-RV starts and is completely integrated into the program.

 

To create a toolbox, proceed as follows:

The Perfect Tool for The Simulation of Large-Scale, Modern and Complex Power Systems

 

EMTP-RV is a sophisticated computer program for the simulation of electromagnetic, electromechanical and control system transients in multiphase electric power systems.

 

Capacitor Bank Switching

 

Powersys performed a capacitor bank switching study for a utility located in North America. The scope of work concerned a Medium Voltage/High Voltage 100MVA substation located at the end of a relatively long radial transmission line. A load increase is forecasted for the next years and it is planned to replace the actual capacitor bank by a 50MVAR unit to provide the additional power without a severe voltage dip.

Power System Stability Case Study

 Powersys performed in 2016 a power system study for an electrical utility located in Central Africa. Following a first study performed in 2013 where some weaknesses and instabilities were highlighted, investments were made during the last few years to strengthen their

Analysis of measurement and simulation results of freight train power supply

If you wish to contact the authors of the newsletter, please contact POWERSYS
 

Analysis of measurement and simulation results of freight train power supply

 

Modeling of electric railway system

A model of electric railway system connected to 110 kV network was developed in order to determine power quality parameters of voltage and current. A model consists of electric railway substation and contact line feeding electric locomotives equipped with diode rectifiers. Figure 12 shows the model in EMTP-RV software which is used for analysis of electromagnetic transients.

An electric railway substation consists of one 110/25 kV transformer with rated power 7.5 MVA which is connected to the transmission grid. The transformer impedance was calculated from the manufacturer data. 

Electromagnetic Interference Between Transmission Lines and Buried Pipelines

If you wish to contact the authors of the newsletter, please contact POWERSYS
 
Electromagnetic Interference between transmission lines and buried pipelines
 

For the company, ENGIE Lab Laborelec, we aPOWERSYS performed an electromagnetic interference study,  in order to evaluate the influences of three transmission lines (220 kV and 70 kV) on a buried gas pipeline. This is according to the standards ITU-T K33 and IEC 60479-1.

Different kinds of installations (metallic pipelines, telecommunication systems, power systems) can be subject to induced voltage and current in the vicinity of electrical systems. The operating conditions (normal steady-state or fault) of the disturbing systems and the position (overhead or buried) of each installation are the origin of inductive, capacitive, or conductive coupling. Electromagnetic interferences studies can be performed to investigate these effects.

The Use of EMTP-RV in the wind energy industry

If you wish to contact the authors of the newsletter, please contact POWERSYS
 
The Use of EMTP-RV in the wind energy industry
 

POWERSYS has discussed EMTP-RV with Mr. Jair Cassoli, Electrical Engineer at Enercon. Founded in 1984 in Germany, ENERCON is a leader in the design and sale of wind turbines and recognized worldwide for reliability and performance of its direct drive generators, its high manufacturing standards and its long-term service agreements.

To date, ENERCON has installed more than 24,500 wind turbines worldwide, ranging from 500 kW to 7.5 MW, accounting for over 38.6 GW of installed capacity. ENERCON employs over 20,000 persons worldwide and has its head office in Aurich, Germany.

 

Application of Saturable Core Fault Current Limiters in Industrial Power Systems - Simulation Study

If you wish to contact the authors of the newsletter, please contact POWERSYS
Application of Saturable Core Fault Current Limiters in Industrial Power Systems - Simulation Study
EDF R&D and the University of Zagreb (Department of Energy and Power Systems, Faculty of Electrical Engineering and Computing) have worked together on the application of saturable core fault current limiters in industrial power systems.
They carried out a simulation study using EMTP-RV and they consequently wrote a technical paper to present their work.
 

The Use of EMTP-RV in the field of Railway

If you wish to contact the authors of the newsletter, please contact POWERSYS
The Use of EMTP-RV in the field of Railway
Powersys has discussed EMTP-RV with Mr. Maxime Berger, Jr. Engineer at Bombardier Transportation, the world's leading manufacturer of both planes and trains.
Mr. Berger is in the division in charge of the Product Developement.

 

The Use of EMTP-RV by a Transmission System Operator (TSO)

If you wish to contact the authors of the newsletter, please contact POWERSYS
The Use of EMTP-RV by a Transmission System Operator (TSO)
Powersys has discussed EMTP-RV with Mr. Sébastien Dennetière, engineer at French transmission system operator RTE (Réseau de transport d’Electricité).
 

EMTP-RV Events

If you wish to contact the authors of the newsletter, please contact POWERSYS
COURSE : Power Electronics Applications on the Grid
June 22-25, 2015 - Lille, France
Due to the increase of renewable energy and DC link, power electronic converters play a more and more important role in the AC network. This course is dedicated to engineers who already know the funding of power electronics and who want to improve their knowledge about the different converters (eg: Modular Multilevel Converter), HVDC links, renewable converters...
 

ETAP and EMTP-RV are working together

If you wish to contact the authors of the newsletter, please contact POWERSYS
ETAP and EMTP-RV are working together
Automatic Import Tool
Thanks to the “EMTP-RV / ETAP Import Tool” you can now use the power of ETAP and EMTP-RV software together for greater analysis capabilities in the area of power system transients.